Works performed in different regions of RoK:

  • North Caspian Region (Atyrau). Supply of sand gravel mixture for railway and automobile roads construction;
  • Installation of mobile Concrete Mixing Plant producing concrete up to 50 m3 per hour for the construction of the Processing Plant, Agip KCO, Atyrau Oblast;
  • Erection of MS-90 mechanized storage for bulk goods, Atyrau;
  • Design of chemicals warehouse at “Zhanazhol” field, Aktobe Oblast;
  • Design of caustic soda mixing plant at “Alibek Mola” field, Aktobe Oblast;
  • Installation of gas distribution station;
  • Refurbishment of flow pipelines and process lines at Unit-3, repair of separators, fitting of pump stations, well ties at Karachaganak field, installation of fire-fighting equipment, cleaning of technological equipment and vessels;
  • Replacement of valves of technological pipelines, foundation, support and racks installation on process lines, sandblasting and painting of tanks and pipes;
  • Karachaganak Waste Management Complex design project;
  • 2002-onwards – laundry services for KPO b.v., Halliburton, Schlumberger, Baker Hughes, Weatherford, Expro, Condensate and others;
  • 2002 – Involved in certification of “Pride Foresail” Drilling Rig, Marseilles, France;
  • 2003-2004 – Installation of more than 10 km lengths fiber-optic cable for the communication of Aksai Industrial Zone with Karachaganak field;
  • 2004 – Design of “Aksaigasservice” JSC operations base at Karabatan station;
  • 2003-2006 – Process equipment technical diagnosis at Unit-2, Unit-3 of Karachaganak Field;
  • 2003-2006 – Aksai-Unit-3 methanol and sweet gas pipeline insulation refurbishment;
  • 2004-2005 – Process Equipment Washing Facility turnkey project;
  • 2005-2006 – Application of fire retardant paint to the existing MRS buildings, Pump House and Gas Metering Unit;
  • 2005-2006 – Inhibitor storage vessels heat insulation works;
  • 2005-2006 – Manufacturing and assembly of metalwork for Condensate JSC Pump Station at Rostoshi village;
  • 2005-2006 – Installation of service platforms, approach roads to KPO b.v. Bolshoi Chagan Facility (Export pipeline);
  • 2005-2006 – Design and construction of garage for special units at Unit-3, Karachaganak project;
  • 2006 – KPC Plant-EcoCenter water pipeline laying (Ø8’’) length: 5 km;
  • 2005-2007 – Upright tank E-806A bottom repairs at MTU-400 facility, Condensate JSC;
  • 2005-onwards – Gas hazardous, welding, NDT services for Shutdown at Unit-3;
  • 2006-onwards – Reservoir water stimulation and withdrawal services at monitoring wells; Supply of brine from 7TK facility to international and local clients;
  • 2007 – Design project of Secondary School No.3 capital repairs, Avangard area, Atyrau city;
  • 2007 – Replacement of condensate pipeline without removal of its shell – 377 mm. at a length of 540 m. over Udoman river;
  • 2007 – Repair of Orenburg-Aksai export pipeline section on Udoman river;
  • 2007-2012 – Removal of 12 illegal tie-ins at KATS and KOTS pipelines;
  • 2007-onwards – Repair of gas, methanol and condensate pipeline No. 2;
  • 2008-onwards – Preparation of passports for Karachaganak Project process lines;
  • 2008-onwards – Design of metal structures at Karachaganak Project;
  • 2007-2009 – Repair of Sweet gas pipeline, 377 mm. at a length of 17 km.;
  • 2007-2009 – Methanol pipeline repair, 168 mm. at a length of 26 km.;
  • 2008-2009 – Production of more than 60000” of prefabricated carbon steel pipes Ø2÷28” for Train 4 Project;
  • 2008-2009– Production of 3120” of prefabricated carbon steel and special-property alloy (stainless and incoloy) pipes for Process Train 4;
  • 2008-2009 – Assembly and installation of more than 13 km. of process equipment and pipelines for Train 4, Ø2÷28”;
  • 2009 – Installation of 4120 m. lengths plastic potable water pipeline Ø8’’ in Aksai;
  • 2009-onwards – Provision of maintenance of buildings and canteens equipment at Karachaganak Project;
  • 2009-onwards – Provision of civil construction and electrical installation services;
  • 2009-2010 – Provision of painting services at Train 4 Project;
  • 2009-2010 – Provision of scaffolding and insulation services at Train 4;
  • 2010 – Design project of General Purpose Incinerator at EcoCenter, Karachaganak Project;
  • 2010 – Replacement of insulating coupling of KPC water re-injection system and RP4, RP6 wells;
  • 2010 – Monorail crane upgrade at KPC Plant Boiler House;
  • 2010 – Installation of Main Line Pump No. 4 at Bolshoi Chagan Pump House;
  • 2010 – Transportation and removal of building wastes from KPC Plant yard and EcoCenter;
  • 2010-2011 – Installation of horizontal flame start-up system at 9 wells, Karachaganak Project;
  • 2010-2012 – Construction of General Purpose Incinerator at EcoCenter, Karachaganak Project;
  • 2010-2012 – Installation of DEG heating system at EcoCenter, Karachaganak Project;
  • 2011 – Replacement of pipelines at NTU-400, Condensate JSC;
  • 2011 – Repair of 3 separators at Unit-3, Karachaganak Project;
  • 2011 – Construction of solid industrial waste disposal yard at EcoCenter;
  • 2011-2012 – Winter road maintenance at Karachaganak Project;
  • 2011-onwards – Supply of production chemicals and support services for Kashagan projects;
  • 2011 – onwards – Rental of specialized transport units at Karachaganak Project;
  • 2012 – Design project of Waste Segregation Unit of EcoCenter at Karachaganak Project;
  • 2012 – Diethylene glycol pipeline upgrade at Unit-2 (DEG-402);
  • 2012 – Revolving furnace upgrade at EcoCenter, Karachaganak Project;
  • 2012 – Wastewater Treatment Facility upgrade at KPC Plant, Karachaganak Project;
  • 2012-onwards – Operation and maintenance of General Purpose Incinerator and Waste Segregation Unit;
  • 2012-onwards – Supply of methanol to Olya ferry port, Astrakhan in ISO-tanks with nitrogen blanket;
  • 2013 – Methanol Storage Facility upgrade, 3 tanks x 2000 m3, Aksaigasservice JSC Logistics Base;
  • 2013 – Provision of methanol to Tengizchevroil in special tanks;
  • 2014-onwards – EcoCentre Maintenance;
  • 2014-onwards – Operation and maintenance of Thermomechanical Cutting Cleaner unit at EcoCentre;
  • 2015-onwards – Shutdown operations at Karachaganak Project. 

The Company has successfully provided its services to the following Clients in Kazakhstan:
KPO b.v., Tengizchevroil LLP, Agip KCO, PFEC, Bonatti, Halliburton, Baker Hughes, Nalco Champion, CCC-Saipem, SICIM S.p.A., Weatherford, Saipar Drilling Company B.V., Schlumberger, “Condensate” JSC and others.